Some Basics You Should Know About Applying For Pueblo County Building Permits

By Stephen Reed


The municipal building department within your area is responsible for enforcing the local building codes. The body, therefore, carries out the duty of issuing building permits before a property owner is allowed to erect a new structure or demolish, renovate or alter an existing one. By applying for Pueblo County building permits, the municipality is able to ensure that the best interests of property owners and the community as a whole are protected.

For any permit to be issued, your application must be reviewed by the municipality and the body will confirm that your undertakings adhere to the local codes. These codes mark the standards that have to be met in terms of building construction and design. Additionally, there are strict resource conservation, accessibility, fire protection, zoning bylaws, health and safety standards that each application must meet before approval.

Legally owning a land parcel does not exclude you from having to seek permission before getting started on certain developments. You must obtain a permit before placing a mobile structure in your land or building one that is more than ten square feet. Permits should also be obtained prior to erecting seasonal buildings, excavating, extending, renovating, repairing or changing the use of existing structures. Any work that needs to be done on an on-site sewer system also warrants a permit from the municipality.

There is a process that follows once a permit is applied for. First, there is a form you must obtain and fill and it can be obtained from the municipality offices or the Ministry of Municipal Affairs website. Before you submit your application form, also attach all documents allied with a project, including building plans and drawings.

If your work is seen to be in compliance with the local building codes and other laws that apply such as the local zoning bylaws, your applications will be sent to other municipal officials for further reviewing. Normally, it is easier and quicker to get a permit if you merely need to make minor additions or changes. It may take longer to get approval for an intricate proposal.

Depending on the nature of the developments you have in mind, your application will be refused or approved between 10-30 days. In the event where a permit cannot be issued, the reasons why will be indicated, allowing you to get the highlighted concerns resolved. If an application is refused because of technical requirements that touch on the zoning bylaws or local building codes, you can decide to work with an attorney to have your matter reviewed in court.

Developments ought to be inspected by the municipality even after you have received your permit. Ideally, there are inspections that ought to take place during various stages of your project. This again allows the municipality to confirm that your undertakings meet the terms of your approved plans and permits as well as the relevant local codes.

If you have never applied for a building permit in the past, the involved process may seem somewhat challenging. You can dodge all the hassles by applying with the help of a seasoned contractor. Such specialists are well acquainted with the requirements that must be met for any application to be approved.




About the Author:



No comments: